Suedhemmern on the Mittelland Canal v 5.0
New in 5.0 version:
– New biogas plant
– Installed doors with opening times
– Instaled built waterway (moving ships on the canal)
– Instaled built trains (2 freight trains)
– Supplemented mill and rebuilt Colii from the pasture
– Fences removed
Author: GMCW
DOWNLOAD 340 MB