Brewery with Production v 2.0

Brewery-with-Production-v-2.0

It is only produced beer when you have delivered the three products (barley, hops and water)

– The roller door is now shut
– In production the capacity would be changed:
– Barley: 150000
– Hops: 120000
– Water: 200000
– Beer / h: 3450
– Beer capacity maximum 200000

Author: GE Mapping

DOWNLOAD 9 MB

You may also like...